The bridge has a total length of 21.8 kilometers, including a 16.5-kilometer sea bridge and a 5.5-kilometer land viaduct. After completion, the commuting time between Mumbai and Navi Mumbai will be shortened from the current 2 hours to 20 minutes, boosting the local economy. India attaches great importance to the MTHL project. Since the start of construction, with the continuous increase in investment, the requirements for lifting capacity, handling performance and transportation of lifting equipment have also increased.
XCG150-IA has been giving full play to its multiple advantages, helping the project to advance steadily and winning praise from users.
1. Strong lifting capacity: XGC150-IA has a maximum lifting capacity of 150 tons, with optional imported brands of main pump, main valve and winch motor.